Content tagged Risk Register
Ordered by publication date from most to less recent.
(These results include any available translations of the original English documents.)
- IFLA PAC Centres attend Memory of the World General Meeting in Gwangju, Korea
Mr. Udaya Cabral Director, IFLA PAC Center Sri Lanka and Ms. Jaesun Lee, Director, IFLA PAC Center Korea attended the 8th UNESCO, MOWCAP (Memory of the World Committee for Asia and...
News - 3 July 2018
Tags: Cultural heritage, Memory of the World, PAC, Preservation, Risk Register, UNESCO, PAC (Preservation and Conservation)
- Disaster Management Conference
A community thrives through its cultural heritage, it dies without it” Cultural heritage consists of tangible and intangible, natural and cultural, movable and immovable...
Event - 9 September 2016
Tags: Conference, Disaster relief, Egypt, Preservation, Risk Register, PAC (Preservation and Conservation)
- Disaster Management Conference
The conference is “Our Heritage at Risk: The Challenges and Response” will address disaster manegement and response with special emphasis on disaster management and cultural...
Event - 29 July 2016
Tags: Conference, Disaster management, Risk Register
- Just launched: IFLA Risk Register for documentary heritage
IFLA has created a Risk Register for documentary heritage in order to raise awareness for the preservation, conservation, and safeguarding of documentary heritage (in any format) world-wide. We...
News - 17 August 2015
Tags: Blue Shield, Cultural heritage, documentary heritage, From the Annual Conference, Risk Register, UNESCO
- Nouveauté : le Registre de l’IFLA pour le patrimoine documentaire
L’IFLA a créé un Registre des risques du patrimoine documentaire afin de favoriser la prise de conscience en matière de préservation, de...
News - 17 August 2015
Tags: Blue Shield, Cultural heritage, documentary heritage, From the Annual Conference, Risk Register, UNESCO
- Nueva Iniciativa: Registro de la IFLA de Riesgos para el Patrimonio Documental
La IFLA ha creado un Registro de riesgos para el patrimonio documental con el fin de sensibilizar sobre la protección, conservación y salvaguarda del patrimonio documental (...
News - 17 August 2015
Tags: Blue Shield, Cultural heritage, documentary heritage, From the Annual Conference, Risk Register, UNESCO
- Gerade gestartet: Das Risikoregister der IFLA für dokumentarisches Erbe
Die IFLA hat ein Risikoregister für das dokumentarische Erbe erstellt, um das Bewusstsein für die Bewahrung, die Erhaltung und die Sicherung des dokumentarischen Erbes (in allen...
News - 17 August 2015
Tags: Blue Shield, Cultural heritage, documentary heritage, From the Annual Conference, Risk Register, UNESCO
- 刚刚发布:国际图联文献遗产风险登记表
为了在全世界范围内提高对文献遗产(无论何种形式)的保存、保护和保卫意识,国际图联建立了文献遗产风险登记表。我们旨在收集文献遗产藏品的信息,从而能在自然或人为灾害发生时,迅速作出响应。 有了风险登记表,国际图联就能在灾难发生时,向联合国教科文组织(UNESCO)和蓝盾国际委员会(International Committee of the Blue...
News - 17 August 2015
Tags: Blue Shield, Cultural heritage, documentary heritage, From the Annual Conference, Risk Register, UNESCO
- بدأنا الآن: سجل الإفلا لحماية التراث الوثائقي من المخاطر
لقد أسست الإفلاسجل حماية التراث الوثائقي من المخاطر؛ لرفع الوعي بحفظ وترميم التراث الوثائقي (في كل أشكاله) وحمايته حول العالم، ونهدف إلى جمع بيانات عن مجموعات المُقتنيات منه؛ من...
News - 17 August 2015
Tags: Blue Shield, Cultural heritage, documentary heritage, From the Annual Conference, Risk Register, UNESCO
- Запущен новый проект: Реестр Риска IFLA для документального наследия
Для того чтобы повысить мировой уровень информированности в сфере сохранения, охраны и защиты документального наследия (в любом виде), IFLA создала Реестр Риска для документального...
News - 17 August 2015
Tags: Blue Shield, Cultural heritage, documentary heritage, From the Annual Conference, Risk Register, UNESCO
- IFLA Risk Register
“Prevention is better than cure. Risk management can minimise the likelihood of degradation of collections.” - UNESCO 2015 Recommendation Implementation Guidelines...
IFLA Group or Activity - 26 June 2015
Tags: Cultural heritage, Risk Register